Skip to main content

Timeline & Key Dates

Move Timeline: The Final Countdown

We are officially under contract for the new farm on Guess Rd! This page tracks the critical dates for closing and the physical move.

March 2026 Schedule

  • March 19 (Wed): Closing on current house (Old Horseman).
  • March 20 (Thu): Closing on the new farm (Guess Rd).
  • March 21 (Fri): New carpet installation at Guess Rd.
  • March 22 (Sat): 🚚 The Big Move Day.
  • March 24 (Mon): Pool table professional move.
  • March 25 (Tue): Final move-out clean at Old Horseman.
  • March 26 (Wed): Final deadline to vacate (Rent-back ends).

Property Comparison

FeatureOld House (Old Horseman)Guess Rd (The Farm)
StyleSingle Floor RanchSingle Floor Ranch
Acreage1.03 Acres8.0 Acres
Living Space2,350 sqft2,650 sqft
Bed/Bath4 BR / 3 Bath4 BR / 2.5 Bath
Garage/ShopHuge attached garageHuge 30x40 detached workshop
ExtrasPoolHorse stable, creek, acreage

Incoming Projects at the Farm

The farm is beautiful, but it comes with a few "Day 1" or early-stage projects:

  • Back Deck: Currently in poor shape; likely needs to be demolished and rebuilt.
  • HVAC: Two units present; both will likely need replacement in the near future.
  • Outbuildings & Structures:
    • Main Workshop: Large 30x40 detached space (the primary shop).
    • Utility Shed: Small pre-fab shed (~8x12).
    • The Stable: Open-sided (20x30), round-post construction. Needs some roof maintenance.

Note: This timeline is subject to change based on standard real estate closing shenanigans. Stay flexible!