# Moving to the Farm

Logistics and guides for the 2026 move

# Sleep Number Climate360 (Split King) Disassembly

# Sleep Number Climate360 (Split King) Disassembly

This guide covers the disassembly of the Sleep Number Climate360 Split King for the 2026 move to Guess Rd.

### Essential Resources
*   **Split King Separation Video:** [How To Move A Sleep Number® FlexFit™ Base](https://www.youtube.com/watch?v=Ixv8gGzxRKQ) (Key section starts at 2:40).
*   **Official Support Guide:** [Moving My Sleep Number Bed](https://support.sleepnumber.com/hc/en-us/articles/360020305694-Moving-My-Sleep-Number-Bed).

### Pre-Move Checklist
- [ ] **Caps:** Obtain 8 air chamber caps (4 for mattresses, 4 for pump). 
- [ ] **Inflate:** Use the app to inflate both sides to 100 before disconnecting anything.
- [ ] **Seal:** Disconnect hoses and immediately cap both the chambers and the pump side.

### Disassembly Steps
1.  **Electronics:** Unplug the main power and the "Sync Cable" that links the two base halves.
2.  **Climate Modules:** Unplug data cables for foot warmers. Label them with tape.
3.  **Split King Separation:**
    *   Locate and unscrew the plastic "speed screws" connecting the frame halves.
    *   Watch for magnet sensors on the base; they are easily knocked off.
4.  **Packing:**
    *   Bag both mattresses (keep them FLAT; never fold or stand on end).
    *   Secure the FlexFit articulation arms with heavy-duty zip ties so they don't "flop" during transit.

# Timeline & Key Dates

# Move Timeline: The Final Countdown

We are officially under contract for the new farm on Guess Rd! This page tracks the critical dates for closing and the physical move.

## March 2026 Schedule

- **March 16 (Mon):** ⚖️ Sign paperwork for current house sale (Old Horseman) with lawyers.
- **March 18 (Wed):** Closing on current house (Old Horseman).
- **March 19 (Thu):** Closing on the new farm (Guess Rd).
- **March 20 (Fri):** New carpet installation at Guess Rd.
- **March 21 (Sat):** 🚚 **The Big Move Day.**
- **March 23 (Mon):** Pool table professional move.
- **March 24 (Tue):** Final move-out clean at Old Horseman.
- **March 25 (Wed):** Final deadline to vacate (Rent-back ends).

---

## Property Comparison

<table id="bkmrk-featureold-house-%28ol"><thead><tr><th>Feature</th><th>Old House (Old Horseman)</th><th>Guess Rd (The Farm)</th></tr></thead><tbody><tr><td>**Style**</td><td>Single Floor Ranch</td><td>Single Floor Ranch</td></tr><tr><td>**Acreage**</td><td>1.03 Acres</td><td>7.66 Acres (*Technically not 8.0!*)</td></tr><tr><td>**Living Space**</td><td>2,350 sqft</td><td>2,629 sqft</td></tr><tr><td>**Bed/Bath**</td><td>4 BR / 3 Bath</td><td>4 BR / 2.5 Bath</td></tr><tr><td>**Garage/Shop**</td><td>Attached Garage (~760 sqft)</td><td>Detached Workshop (~897 sqft)</td></tr><tr><td>**Hot Water**</td><td>Tankless (Natural Gas)</td><td>35gal Tank (Crawlspace)</td></tr><tr><td>**Extras**</td><td>Pool</td><td>Horse stable, creek, acreage</td></tr></tbody></table>

---

## Incoming Projects at the Farm

The home inspection highlighted several immediate repairs and desired upgrades:

- **High Priority: Primary Bath Floor &amp; Plumbing:**
    - **Repair:** Serious rot in floor under the shower. Needs structural repair ASAP.
    - **Upgrade:** Relocate water heater from crawlspace to a bathroom closet.
    - **Upgrade:** Replace existing 35gal tank with a high-capacity 85gal electric tank (to support Erin"s legendary hot showers).
- **Front Door Threshold:** Rot detected under font door. Requires sistering a 2x8 board to existing structure. (*Contractor project: tight crawlspace access.*)
- **Back Deck:** Poor condition; likely demolition and rebuild project.
- **HVAC:** Two units present; anticipated replacement needed in the near future.
- **Outbuildings &amp; Structures:**
    - **Main Workshop:** Detached space, approximately 897 sqft (~30x30 or 25x35).
    - **Utility Shed:** Small pre-fab shed (~8x12).
    - **The Stable:** 20x30 open-sided structure. Needs roof maintenance.

---

*Note: This timeline is subject to change based on standard real estate closing shenanigans. Stay flexible!*

# Project: Primary Bath Remodel

# Primary Bathroom Remodel &amp; Structural Repair

The primary bathroom at the Farm requires a full renovation, driven by the need to repair structural rot found during the home inspection and the desire to modernize the layout from its original ADA-focused design.

## Current Challenges

- **Structural Rot:** Significant moisture damage exists under the shower area. The shower must be removed to replace structural components and sub-flooring.
- **Legacy ADA Layout:** Designed for wheelchair accessibility, featuring a curbless shower with a rubber bumper (the likely source of the leak) and open space under the vanities.
- **Plumbing:** The current 35gal water heater is located in the crawlspace and is insufficient for family needs.

## The Vision

### Layout Changes

- **The "Super Closet":** Combine the two existing small closets into one large utility and storage closet.
- **Water Heater Relocation:** Move the hot water source from the crawlspace into the new bathroom closet. Replace it with a **high-capacity 85gal electric tank**.
- **Modern Vanity:** Replace the open-bottom ADA vanity with a standard double vanity for more storage.

### Fixtures &amp; Finishes

- **Custom Shower:** Design and build a tiled, custom shower with a proper ledge to prevent future leaks.
- **Smart Toilet:** Install a bidet beside the toilet or upgrade to a modern smart toilet with integrated bidet features.

---

## Planning &amp; Documentation

For more technical details on the inspection findings that triggered this project, see the [Timeline &amp; Key Dates](/books/moving-to-the-farm/page/timeline-key-dates) page or refer to `StructuralInspection.pdf` in Paperless.

# Project: Braxton"s Backyard Fence

# Project: Braxton"s Backyard Fence

One of the top "Day 0" priorities upon moving to the farm is securing a safe backyard area for Braxton. This project involves extending and reinforcing the existing pasture fencing to create a secure perimeter.

## The Vision

- **Aesthetics:** To match the existing pasture look, we are using **round wood posts** throughout. We are intentionally skipping T-posts to maintain the clean, "farm-style" look of the existing board fence.
- **Reinforcement:** While the existing board fence looks nice, it isn"t enough to keep a dog contained. We will be stretching **sheepwire** along the board fence sections to make them dog-proof.
- **Integration:** The new fencing will tie into existing pasture lines where possible to minimize material needs and labor.

## Equipment &amp; Tools

- **The Manual Way:** Standing by with a standalone two-person auger for initial post holes.
- **The Dream Upgrade:** Future tractor purchase (likely a 30-40hp Compact Utility Tractor or "CUT").
- **Attachment Wishlist:** A tractor-mounted **auger attachment** for digging posts without the back-breaking labor of the hand-held unit.

---

*This project is a high priority to ensure Braxton can enjoy the 8 acres safely as soon as we arrive.*